Uploaded image for project: 'Data Management'
  1. Data Management
  2. DM-2070

FY18 Build AP-ready Data Provenance System

    XMLWordPrintable

    Details

    • Type: Epic
    • Status: Invalid
    • Resolution: Done
    • Fix Version/s: None
    • Component/s: Database
    • Labels:
      None
    • Epic Name:
      FY18 AP-ready Data Provenance
    • Story Points:
      79
    • WBS:
      02C.06.01.01
    • Team:
      Data Access and Database

      Description

      Improvements to the first version of the standalone prototype built through DM-2042. Discussions with the Application Team on capturing provenance and integrating DRP with the provenance system. Add scaffolding / unit tests that will simulate data producers, in particular DRP.

      Deliverable: DRP-ready System for capturing provenance.

        Attachments

          Issue Links

            Activity

            Hide
            fritzm Fritz Mueller added a comment -

            This epic applied to the old "Jacek-era" database provenance design, which is no longer planned. Redesign suggestion from the Provenance Working Group is expected shortly; necessary work downstream of that report to be ticketed separately.

            Show
            fritzm Fritz Mueller added a comment - This epic applied to the old "Jacek-era" database provenance design, which is no longer planned. Redesign suggestion from the Provenance Working Group is expected shortly; necessary work downstream of that report to be ticketed separately.

              People

              Assignee:
              Unassigned Unassigned
              Reporter:
              fritzm Fritz Mueller
              Watchers:
              Fritz Mueller
              Votes:
              0 Vote for this issue
              Watchers:
              1 Start watching this issue

                Dates

                Created:
                Updated:
                Resolved:

                  Jenkins

                  No builds found.