Uploaded image for project: 'Data Management'
  1. Data Management
  2. DM-2070

FY18 Build AP-ready Data Provenance System

    XMLWordPrintable

Details

    • Epic
    • Status: Invalid
    • Resolution: Done
    • None
    • Database
    • None
    • FY18 AP-ready Data Provenance
    • 79
    • 02C.06.01.01
    • Data Access and Database

    Description

      Improvements to the first version of the standalone prototype built through DM-2042. Discussions with the Application Team on capturing provenance and integrating DRP with the provenance system. Add scaffolding / unit tests that will simulate data producers, in particular DRP.

      Deliverable: DRP-ready System for capturing provenance.

      Attachments

        Issue Links

          Activity

            This epic applied to the old "Jacek-era" database provenance design, which is no longer planned. Redesign suggestion from the Provenance Working Group is expected shortly; necessary work downstream of that report to be ticketed separately.

            fritzm Fritz Mueller added a comment - This epic applied to the old "Jacek-era" database provenance design, which is no longer planned. Redesign suggestion from the Provenance Working Group is expected shortly; necessary work downstream of that report to be ticketed separately.

            People

              Unassigned Unassigned
              fritzm Fritz Mueller
              Fritz Mueller
              Votes:
              0 Vote for this issue
              Watchers:
              1 Start watching this issue

              Dates

                Created:
                Updated:
                Resolved:

                Jenkins