Update the existing Photon Transfer Curve measurement task to pipelineTasks (gen 3 butler)
Attachments
Issue Links
- is blocked by
-
DM-21981 Inconsistency in LSST amplifier bboxes between Gen2 and Gen3
- Done
-
DM-23159 Make PTC task compatible with RFC-352
- Done
- is child task of
-
DM-21212 Update existing cp_pipe tasks to pipelineTasks
- Done
- is parent task of
-
DM-26697 Deprecate needing to pre-pair exposures in PTC task, and calculate an appropriate pair based on header data.
- Done
-
DM-26725 Update the PTC dataset to be a proper IsrCalib
- Done
(2 mentioned in)
The PTC task has been refactored in the past few months (e.g.,
DM-20070) in such a way that we can move forward with this ticket. We discussed with @czw how to do so. Chris proposes:DM-26697DM-26725DM-23159DM-23159