Uploaded image for project: 'Data Management'
  1. Data Management
  2. DM-24338

Audit status of calibrations in obs_decam

    Details

    • Story Points:
      6
    • Epic Link:
    • Sprint:
      AP F20-1 (June), AP F20-2 (July), AP F20-5 (October)
    • Team:
      Alert Production
    • Urgent?:
      No

      Description

      One we are using stack-produced basic calibrations (e.g., biases, flats) with DECam, we should ensure we have the capability to apply other relevant calibrations (brighter-fatter, nonlinearity, dark correction, fringe correction, illumination correction, pixel area correction, etc.).

      This ticket is to review this document, Morganson et al 2018, the DECam CP pipeline docs, Bosch et al 2018, and obs_suburu; identify any relevant missing steps; and ticket their implementation.

        Attachments

          Issue Links

            Activity

            ebellm Eric Bellm created issue -
            ebellm Eric Bellm made changes -
            Field Original Value New Value
            Link This issue is triggered by DM-24253 [ DM-24253 ]
            swinbank John Swinbank made changes -
            Epic Link DM-24344 [ 433031 ]
            ebellm Eric Bellm made changes -
            Link This issue is triggering DM-19284 [ DM-19284 ]
            ebellm Eric Bellm made changes -
            Link This issue is triggering DM-19284 [ DM-19284 ]
            ebellm Eric Bellm made changes -
            Link This issue relates to DM-19284 [ DM-19284 ]
            swinbank John Swinbank made changes -
            Sprint AP S20-6 (May) [ 987 ] AP F20-1 (June) [ 1019 ]
            swinbank John Swinbank made changes -
            Rank Ranked higher
            swinbank John Swinbank made changes -
            Epic Link DM-24344 [ 433031 ] DM-25146 [ 435264 ]
            swinbank John Swinbank made changes -
            Sprint AP F20-1 (June) [ 1019 ] AP F20-1 (June), AP F20-2 (July) [ 1019, 1025 ]
            swinbank John Swinbank made changes -
            Sprint AP F20-1 (June), AP F20-2 (July) [ 1019, 1025 ] AP F20-1 (June), AP F20-2 (July), AP F20-3 (August) [ 1019, 1025, 1033 ]
            ebellm Eric Bellm made changes -
            Sprint AP F20-1 (June), AP F20-2 (July), AP F20-3 (August) [ 1019, 1025, 1033 ] AP F20-1 (June), AP F20-2 (July), AP F20-5 (October) [ 1019, 1025, 1046 ]
            ebellm Eric Bellm made changes -
            Rank Ranked lower

              People

              • Assignee:
                mrawls Meredith Rawls
                Reporter:
                ebellm Eric Bellm
                Watchers:
                Eric Bellm, John Swinbank
              • Votes:
                0 Vote for this issue
                Watchers:
                2 Start watching this issue

                Dates

                • Created:
                  Updated:

                  Summary Panel