QA tooling and monitoring of the AP pipeline in S20B

    Details

    • Type: Epic
    • Status: Done
    • Resolution: Done
    • Fix Version/s: None
    • Component/s: None
    • Labels:
      None
    • Epic Name:
      s20b-ap-qa
    • Story Points:
      99.9
    • WBS:
      02C.03.08
    • Team:
      Alert Production
    • Cycle:
      Spring 2020

      Description

      To include:

      • Analysis in preparation for the algorithms workshop;
      • Debugging the DCR mitigation system to address issues discovered in preparation for the above;
      • Processing of “fakes” through the AP pipeline;
      • Regular pipeline reprocessing, and QA analysis;
      • Generation of calibration products using Rubin observatory tooling.

        Attachments

          Activity

          Hide
          swinbank John Swinbank added a comment -

          This work continues on DM-25146.

          Show
          swinbank John Swinbank added a comment - This work continues on DM-25146 .

            People

            • Assignee:
              swinbank John Swinbank
              Reporter:
              swinbank John Swinbank
              Watchers:
              John Swinbank
            • Votes:
              0 Vote for this issue
              Watchers:
              1 Start watching this issue

              Dates

              • Created:
                Updated:
                Resolved:

                Summary Panel