    Details

    • Type: Epic
    • Status: Done
    • Resolution: Done
    • Fix Version/s: None
    • Component/s: ts_eas
    • Labels:
    • Epic Name:
      EAS Basic Stage
    • Story Points:
      30
    • WBS:
      1.04C.15.2 (Main Telescope)
    • Team:
      Telescope and Site
    • Epic Priority:
      4

      Description

      Completion of development of the DIMM, Weather Station, wind sensor and start up and shutdown of the complete EAS system.

        Attachments

          Issue Links

          Stories in Epic (Custom Issue Matrix)

          Key Summary Story Points Assignee Status
           
          DM-29777

          Make sure that the HVAC device mask is a long long

          0 Wouter van Reeven Done
           
          DM-29833

          Support dome coditioning contract

          4 German Schumacher Done
           
          DM-30847

          Support DatControl during their visit to the summit on June 23 and 25, 2021

          2 Wouter van Reeven Done
           
          DM-29230

          Refactoring of DIMM code

          3 Wouter van Reeven Done
           
          DM-29179

          Attend EAS-related meetings.

          1 Wouter van Reeven Done
           
          DM-29033

          Fix conda build for several packages

          0 Wouter van Reeven Done
           
          DM-29524

          Create Puppet proposal for Raspberry Pi

          1 Wouter van Reeven Done
           
          DM-29502

          Upgrade to black 20.8b1 and remove asynctest from several projects

          1 Wouter van Reeven Done
           
          DM-28939

          Catch-all ticket for projects upgrade to ts_salobj 6.3

          1 Wouter van Reeven Done
           
          DM-28934

          Fix WeatherStation CSC units

          1 Wouter van Reeven Done
           
          DM-31304

          Inspect HVAC telemetry produced by VM

          1 Wouter van Reeven Done
           
          DM-28090

          WeatherStation must send CMD_INPROGRESS while executing state transition commands

          0 Wouter van Reeven Done
           
          DM-29620

          Consolidate HVAC commands (part 2: IDL and HVAC code)

          4 Wouter van Reeven Done
           
          DM-31774

          Consolidate multi-channel temperature topics into one topic

          1 Wouter van Reeven Done
           
          DM-28586

          Remove perc from all HVAC telemetry and command items

          1 Wouter van Reeven Done
           
          DM-24832

          Check DIMM code against latest documentation

          2 Wouter van Reeven Done
           
          DM-31469

          Adopt HVAC XML and code to new Excel sheet.

          1 Wouter van Reeven Done
           
          DM-31456

          Create DIMM documentation

          2 Wouter van Reeven Done
           
          DM-31450

          Fix if statement determining the status of the Astelco DIMM controller

          0 Wouter van Reeven Done
           
          DM-30898

          Update DIMM CSC according to telemetry tests

          2 Wouter van Reeven Done
           
          DM-28874

          Run DIMM

          1 Wouter van Reeven Won't Fix
           
          DM-28098

          Rename the environment Docker file

          1 Wouter van Reeven Won't Fix

            Activity

            Hide
            aclements Andy Clements added a comment -

            The story points for  this epic have been completed.  The EAS work will continue with epics DM-27560 & DM-27561.  Brian, can you please review this epic?  Thanks

            Show
            aclements Andy Clements added a comment - The story points for  this epic have been completed.  The EAS work will continue with epics DM-27560 & DM-27561 .  Brian, can you please review this epic?  Thanks
            Hide
            bstalder Brian Stalder added a comment -

            DIMM, and weather station CSCs are back to regular normal operations.  further features for the DIMM are needed at a later stage.

            Show
            bstalder Brian Stalder added a comment - DIMM, and weather station CSCs are back to regular normal operations.  further features for the DIMM are needed at a later stage.

              People

              Assignee:
              wvreeven Wouter van Reeven
              Reporter:
              aclements Andy Clements
              Reviewers:
              Brian Stalder
              Watchers:
              Andy Clements, Brian Stalder, German Schumacher
              Votes:
              0 Vote for this issue
              Watchers:
              3 Start watching this issue

                Dates

                Due:
                Created:
                Updated:
                Resolved:
                Start date:
                End date: