  2. DM-27574

Calibration Equipment

    XMLWordPrintable

    Details

    • Epic Name:
      Calibration Equipment
    • Story Points:
      80
    • WBS:
      1.04C.15.2 (Main Telescope)
    • Team:
      Telescope and Site
    • Epic Priority:
      3

      Description

      Epic for work concerning the Linear Stage, CBP, Laser and thermo control systems. Approx 2 months effort for each system.

        Attachments

          Issue Links

          Stories in Epic (Custom Issue Matrix)

          Key Summary Story Points Assignee Status
           
          DM-35573

          Install Spatial Analyzer and test updated CSC

          4 Dave Mills Done
           
          DM-35891

          CBP updates based on lab testing

          3 Eric Coughlin Done
           
          DM-36029

          Fix electrometer slow measurement separation part 1

          2 Eric Coughlin Done
           
          DM-28610

          Write Mitutoyo controller for PMD

          2 Eric Coughlin Done
           
          DM-27602

          Add separate error tolerances for different encoders in CBP

          1 Eric Coughlin Done
           
          DM-27692

          Figure out how the CBP handles out-of-bounds commands

          1 Eric Coughlin Done
           
          DM-29504

          Upgrade to Black 20.08_b1 for my CSCs

          1 Eric Coughlin Done
           
          DM-28369

          Create skeleton CSC for PMD

          2 Eric Coughlin Done
           
          DM-31170

          Prep for NRK visit

          3 Colin Winslow [X] (Inactive) Done
           
          DM-24470

          Rename clearFaultState to clearLaserFault

          1 Eric Coughlin Done
           
          DM-34674

          Help Patrick with TunableLaser setup

          2 Eric Coughlin Done
           
          DM-34673

          Experiment with setup.cfg and pyproject.toml for CBP

          2 Eric Coughlin Done
           
          DM-34530

          Publish intensity event Electrometer

          4 Eric Coughlin Done
           
          DM-35258

          Add Burst mode to Laser CSC

          8 Eric Coughlin Done
           
          DM-34222

          Make an example notebook for Electrometer for commissioning activities

          2 Eric Coughlin Done
           
          DM-33990

          startScanDt does not finish

          4 Eric Coughlin Done
           
          DM-33989

          Fix electrometer CSC not publishing updated values

          2 Eric Coughlin Done
           
          DM-33435

          Switch ts_electrometer to use tcp/ip

          3 Eric Coughlin Done
           
          DM-31743

          Hands on intro to Laser tracker setup

          0.5 Dave Mills Done
           
          DM-31734

          Study the Alignment system code and documentation

          2 Dave Mills Done
           
          DM-34901

          Laser CSC doesn't implement physical laser configuration on transition to enabled Part 2

          2 Eric Coughlin Done
           
          DM-33926

          Upgrade CSCs to support salobj 7

          4 Eric Coughlin Done
           
          DM-33792

          Deploy electrometer -serial version - summit

          2 Eric Coughlin Done
           
          DM-32949

          Fix failing TunableLaser conda build

          2 Eric Coughlin Done
           
          DM-32761

          Deploy Electrometer CSC (photodiode)

          2 Eric Coughlin Done
           
          DM-32130

          ASC Work and Documentation

          10 Colin Winslow [X] (Inactive) Done
           
          DM-32077

          prep test execution details in jira

          8 Colin Winslow [X] (Inactive) Done
           
          DM-35036

          Fix electrometer CSC not publishing correct filter states

          1 Eric Coughlin Done

            Activity

            Hide
            aclements Andy Clements added a comment -

            Hi Patrick - Epic DM-27574 has used up it's SP and therefore is completed.  Can you review it?   Work with continue in DM-32098 Calibration Verification.  Thanks.

            Show
            aclements Andy Clements added a comment - Hi Patrick - Epic DM-27574 has used up it's SP and therefore is completed.  Can you review it?   Work with continue in DM-32098 Calibration Verification.  Thanks.
            Hide
            pingraham Patrick Ingraham added a comment -

            The thermal control aspects are unstarted. The other bits are in pretty decent shape.
            Should the milestone be moved/adjusted (DM-27581) ?

            Show
            pingraham Patrick Ingraham added a comment - The thermal control aspects are unstarted. The other bits are in pretty decent shape. Should the milestone be moved/adjusted ( DM-27581 ) ?
            Hide
            aclements Andy Clements added a comment -

            yep I can move the milestone to DM-32098 Calibration Verification.

            Show
            aclements Andy Clements added a comment - yep I can move the milestone to DM-32098 Calibration Verification.
            Hide
            pingraham Patrick Ingraham added a comment - - edited

            I don't think DM-35573, DM-31743, DM-32130, DM-32077, DM-31734 and DM-31743 are related to calibration... do they have another place they should be?

            Show
            pingraham Patrick Ingraham added a comment - - edited I don't think DM-35573 , DM-31743 , DM-32130 , DM-32077 , DM-31734 and DM-31743 are related to calibration... do they have another place they should be?
            Hide
            aclements Andy Clements added a comment -

            There is no Alignment System Component epic, so this epic was the chosen.  Further work for calibration will happen in DM-32098, DM-32099 & DM-32100 which contain 348 story points worth of work, which should be able to cover all Calibration work as well as anything else with ASC till the end of construction.

            Show
            aclements Andy Clements added a comment - There is no Alignment System Component epic, so this epic was the chosen.  Further work for calibration will happen in DM-32098 , DM-32099 & DM-32100 which contain 348 story points worth of work, which should be able to cover all Calibration work as well as anything else with ASC till the end of construction.

              People

              Assignee:
              ecoughlin Eric Coughlin
              Reporter:
              aclements Andy Clements
              Reviewers:
              Patrick Ingraham
              Watchers:
              Andy Clements, Brian Stalder, Patrick Ingraham
              Votes:
              0 Vote for this issue
              Watchers:
              3 Start watching this issue

                Dates

                Due:
                Created:
                Updated:
                Resolved:
                Start date:
                End date:

                  Jenkins

                  No builds found.