Details
-
Type:
Epic
-
Status: Done
-
Resolution: Done
-
Fix Version/s: None
-
Component/s: ts_main_telescope
-
Labels:
-
Epic Name:M2 Wish List Changes
-
Story Points:50
-
WBS:1.04C.15.2 (Main Telescope)
-
Team:Telescope and Site
-
Epic Priority:5
Description
Epic to contain wish list changes described in LTS-146 and LTS-162 that are not captured in the DM-27584
Do these have dependencies on the M2 code rewrite?