Details
-
Type:
Milestone
-
Status: To Do
-
Resolution: Unresolved
-
Fix Version/s: None
-
Component/s: ts_integration
-
Labels:None
-
Milestone Level:3
-
WBS:1.04C.15.9 (Integration and Test)
-
Team:Telescope and Site
Description
Includes:
- Dynamic testing of M1M3 w/ surrogate on the TMA
- M3 Optical Testing
- M1M3 Mirror & Thermal Control Testing on the TMA
- In Dome Calibration System Alignment