Details
-
Type:
Story
-
Status: Done
-
Resolution: Done
-
Fix Version/s: None
-
Component/s: ts_main_telescope
-
Labels:
-
Story Points:3
-
Epic Link:
-
Sprint:TSSW Sprint - Jan 4 - Jan 18
-
Team:Telescope and Site
-
Urgent?:No
Description
Support the summit activity of rotator/CCW integration test.
Attachments
Issue Links
- is triggering
-
DM-28211 MTRotator: use tv_sec instead of mjd when reading time from the low-level controller
- Done
-
DM-28224 The mjd and frac_mjd values in MT rotator (and hexapod?) headers are incorrect
- Done
-
DM-28238 Fix the Bug of M2 Telemetry File
- Done
-
DM-28272 Support the Log File in Rotator EUI
- Done
-
DM-28273 Support the Log File in Hexapod EUI
- Done
- relates to
-
DM-28413 Support the Summit Activity
- Done
-
DM-27942 Deploy the M2 Software on Swapped M2 cRIO
- Done
I got the connection between M2 cRIO and server now. I got the power status telemetry.

