      Support the summit activity of M2 and rotator/CCW tests.

        Attachments

        1. Axis_A.jpg
          Axis_A.jpg
          162 kB
        2. CamHexDr1_axis_A.jpg
          CamHexDr1_axis_A.jpg
          167 kB
        3. guiPinStatus.png
          guiPinStatus.png
          128 kB
        4. onlyInterlockFaultNow_1.png
          onlyInterlockFaultNow_1.png
          273 kB
        5. onlyInterlockfaultNow_2.png
          onlyInterlockfaultNow_2.png
          441 kB

          Issue Links

            Activity

            Hide
            ttsai Te-Wei Tsai added a comment -

            Help Andrew to use the rotator EUI executable. Support Felipe to solve the drive connection.

            Show
            ttsai Te-Wei Tsai added a comment - Help Andrew to use the rotator EUI executable. Support Felipe to solve the drive connection.
            Hide
            ttsai Te-Wei Tsai added a comment -

            I updated the M2 hexapod code. I do not have the limit switch fault now:

            Show
            ttsai Te-Wei Tsai added a comment - I updated the M2 hexapod code. I do not have the limit switch fault now:
            Hide
            ttsai Te-Wei Tsai added a comment -

            I did the M2 hexapod test with Felipe today. We tested the updated GUI and low-level control system can reflect the change of limit switch without the problem. We moved the M2 hexapod back to zero followed by z=100 um without the problem. We also checked the system can transition to the Fault state from Enabled state when the interlock is triggered. After the clearing of error, the system went back to the Standby state. All works well. Now, we need to help Holger to operate the GUI by himself to do the functional test. Andrew will support him to set up the x2go for this.

            Show
            ttsai Te-Wei Tsai added a comment - I did the M2 hexapod test with Felipe today. We tested the updated GUI and low-level control system can reflect the change of limit switch without the problem. We moved the M2 hexapod back to zero followed by z=100 um without the problem. We also checked the system can transition to the Fault state from Enabled state when the interlock is triggered. After the clearing of error, the system went back to the Standby state. All works well. Now, we need to help Holger to operate the GUI by himself to do the functional test. Andrew will support him to set up the x2go  for this.
            Hide
            ttsai Te-Wei Tsai added a comment -

            Supported the summit activity for rotator, hexapod, and M2.

            Show
            ttsai Te-Wei Tsai added a comment - Supported the summit activity for rotator, hexapod, and M2.
            Hide
            aclements Andy Clements added a comment -

            Te-Wei did a lot of work support the summit this sprint - the details of it are in the comments.  Work for this task is complete.

            Show
            aclements Andy Clements added a comment - Te-Wei did a lot of work support the summit this sprint - the details of it are in the comments.  Work for this task is complete.

              People

              Assignee:
              ttsai Te-Wei Tsai
              Reporter:
              ttsai Te-Wei Tsai
              Reviewers:
              Andy Clements
              Watchers:
              Andy Clements, Te-Wei Tsai
              Votes:
              0 Vote for this issue
              Watchers:
              2 Start watching this issue

                Dates

                Created:
                Updated:
                Resolved:
                Start date:
                End date:

                  Jenkins

                  No builds found.