Details
-
Type:
Story
-
Status: Done
-
Resolution: Done
-
Fix Version/s: None
-
Component/s: ts_main_telescope
-
Labels:
-
Story Points:0
-
Epic Link:
-
Sprint:TSSW Sprint - Mar 28 - Apr 11
-
Team:Telescope and Site
-
Urgent?:No
Description
Test the camera hexapod for the reading of current and voltage. In DM-34091, we realized the problem of previous code update for the PDO mapping of current and voltage. This ticket will need to rebase the previous branches of hexapod controller and EUI to the latest develop branch and test the results on summit.
Attachments
Issue Links
- is triggered by
-
DM-34091 EtherLab Traning
- Done
I have the following error on summit:
LSST Wrapper: Fail to send the telemetry: Message too long
The above error is because I forgot to de-register the message queue.