Uploaded image for project: 'Data Management'
  1. Data Management
  2. DM-3628

HSC port: verification

    Details

    • Type: Epic
    • Status: Done
    • Resolution: Done
    • Fix Version/s: None
    • Component/s: None
    • Labels:
      None
    • Templates:
    • Epic Name:
      HSC port: verification
    • Story Points:
      50
    • WBS:
      02C.04.06
    • Team:
      Data Release Production
    • Cycle:
      Winter 2016

      Description

      Compare the LSST and (old) HSC stacks for compatibility; identify and resolve any differences. Provide basic integration tests to SQuaRE to ensure the reliable and consistent operation of the LSST stack for processing HSC data. Cooperate with the SQuaRE team to develop more elaborate QA testing.

      This work is timeboxed to consume the available effort in W16, and will be continued in the subsequent cycle.

        Attachments

          Container Issues

            Activity

              People

              • Assignee:
                swinbank John Swinbank
                Reporter:
                swinbank John Swinbank
                Watchers:
                John Swinbank
              • Votes:
                0 Vote for this issue
                Watchers:
                1 Start watching this issue

                Dates

                • Created:
                  Updated:
                  Resolved:

                  Summary Panel