Uploaded image for project: 'Data Management'
  1. Data Management
  2. DM-3840

LSE-72: Phase 3 in X16

    Details

    • Epic Name:
      SE - LSE-72: Phase 3 details
    • Story Points:
      8
    • WBS:
      02C.02.02
    • Team:
      Architecture
    • Cycle:
      Extra 2016

      Description

      Advance Phase 3 details as needed to eliminate obstacles to OCS and DM development during F16.

        Attachments

          Issue Links

            Activity

            Hide
            gpdf Gregory Dubois-Felsmann added a comment -

            Moving this to X16 because work on it was blocked until LSE-70 and LSE-209 had settled out.

            Show
            gpdf Gregory Dubois-Felsmann added a comment - Moving this to X16 because work on it was blocked until LSE-70 and LSE-209 had settled out.
            Hide
            gpdf Gregory Dubois-Felsmann added a comment -

            Continues to be blocked waiting for completion of OCS interface documentation.

            Show
            gpdf Gregory Dubois-Felsmann added a comment - Continues to be blocked waiting for completion of OCS interface documentation.
            Hide
            ktl Kian-Tat Lim added a comment -

            LSE-72 was updated in LCR-1006

            Show
            ktl Kian-Tat Lim added a comment - LSE-72 was updated in LCR-1006

              People

              • Assignee:
                ktl Kian-Tat Lim
                Reporter:
                gpdf Gregory Dubois-Felsmann
                Watchers:
                Gregory Dubois-Felsmann, Jeff Kantor, Kian-Tat Lim, Steve Pietrowicz
              • Votes:
                0 Vote for this issue
                Watchers:
                4 Start watching this issue

                Dates

                • Created:
                  Updated:
                  Resolved:

                  Summary Panel