      Description

      Clarify the data format and precision requirements of the TCS (or other Telescope and Site components) on the reporting of WCS and PSF information by DM on a per-image basis.

      Depends on the ability of the T&S group to engage with this subject.

      Current PMCS deadline for Phase 3 readiness of LSE-75 is 29-Sep-2015.

        Attachments

          Activity

          Hide
          sthomas Sandrine Thomas added a comment - - edited

          Gregory and I have been more active on the update of LSE-75. Realistically, I don't think it will be done by Sept 29th 2015 but I definitely hope it will be by the end of Winter 2016.

          Show
          sthomas Sandrine Thomas added a comment - - edited Gregory and I have been more active on the update of LSE-75. Realistically, I don't think it will be done by Sept 29th 2015 but I definitely hope it will be by the end of Winter 2016.
          Hide
          gpdf Gregory Dubois-Felsmann added a comment -

          A small amount of work was done in Winter 2016, but the actual change request will be done in X16. Moving this epic to X16 accordingly.

          Show
          gpdf Gregory Dubois-Felsmann added a comment - A small amount of work was done in Winter 2016, but the actual change request will be done in X16. Moving this epic to X16 accordingly.
          Hide
          gpdf Gregory Dubois-Felsmann added a comment -

          This is on hold pending a reassessment as part of the Level 1 system design of the general capability of returning telemetry from DM to other Observatory systems via the OCS middleware.

          Show
          gpdf Gregory Dubois-Felsmann added a comment - This is on hold pending a reassessment as part of the Level 1 system design of the general capability of returning telemetry from DM to other Observatory systems via the OCS middleware.
          Hide
          gpdf Gregory Dubois-Felsmann added a comment -

          Moved to F16 after discussion with Jacek Becla.

          Show
          gpdf Gregory Dubois-Felsmann added a comment - Moved to F16 after discussion with Jacek Becla .
          Hide
          ktl Kian-Tat Lim added a comment -

          LSE-75 was updated, including the WCS and PSF requirements, in LCR-1230.

          Show
          ktl Kian-Tat Lim added a comment - LSE-75 was updated, including the WCS and PSF requirements, in LCR-1230.

            People

            Assignee:
            ktl Kian-Tat Lim
            Reporter:
            gpdf Gregory Dubois-Felsmann
            Watchers:
            Gregory Dubois-Felsmann, Jacek Becla, Jeff Kantor, Kian-Tat Lim, Sandrine Thomas
            Votes:
            0 Vote for this issue
            Watchers:
            5 Start watching this issue

              Dates

              Created:
              Updated:
              Resolved:

                Jenkins

                No builds found.