Update LSE-61 requirements and traceability

    Details

    • Type: Epic
    • Status: Done
    • Resolution: Done
    • Fix Version/s: None
    • Component/s: Requirements Documents
    • Labels:
      None
    • Epic Name:
      F16-Arch-DMSR
    • Story Points:
      40
    • WBS:
      02C.02.02
    • Team:
      Architecture
    • Cycle:
      Fall 2016

      Description

      With the updates to DPDD and LDM-151 in the early part of F16, there is a need to update LSE-61 (DMSR) such that it can directly trace requirements from OSS+DPDD through LSE-61 and down to implementation LDM documents.

      This will require substantial rewrites of many of the existing requirements and possible addition of new requirements. It may also be necessary to add annotations to DPDD and other LDM documents to provide traceability anchors for DMSR.

      The outcome of this epic is a new baselined DMSR approved by CCB.

        Attachments

        Stories in Epic (Custom Issue Matrix)

          Activity

          Hide
          tjenness Tim Jenness added a comment -

          The updated LDM-151 has not been delivered so no traceability could be included. Some OSS tracing has occurred but this epic deliverable has not been completed. DPDD tracing, learning EA and adding DPDD requirements to LSE-61 has dominated this epic.

          Show
          tjenness Tim Jenness added a comment - The updated LDM-151 has not been delivered so no traceability could be included. Some OSS tracing has occurred but this epic deliverable has not been completed. DPDD tracing, learning EA and adding DPDD requirements to LSE-61 has dominated this epic.
          Hide
          tjenness Tim Jenness added a comment -

          Closing this as the flow down from DPDD to LSE-61 has been completed along with additional fixups of existing requirements and some flow down from OSS. A change request has not been filed as we are expecting more requirements changes as the replan continues.

          Show
          tjenness Tim Jenness added a comment - Closing this as the flow down from DPDD to LSE-61 has been completed along with additional fixups of existing requirements and some flow down from OSS. A change request has not been filed as we are expecting more requirements changes as the replan continues.

            People

            • Assignee:
              tjenness Tim Jenness
              Reporter:
              tjenness Tim Jenness