Details
-
Type:
Epic
-
Status: Done
-
Resolution: Done
-
Fix Version/s: None
-
Component/s: None
-
Labels:
-
Epic Name:Detailed functional breakdown of Batch Production Services software
-
Story Points:30
-
WBS:02C.07.01
-
Team:Data Facility
-
Cycle:Fall 2016
Description
Functional decomposition of batch production service software based on Batch Production Services Concept of Operations. Includes "middleware/workflow conops," and specifies technical components (e.g., activator, orchestration, workload management system, campaign manager,etc.) and their respective responsibilities within the production system. Coordinated with/supported by Steering Group. Feeds into replanning.
Deliverable: Provide input to RFC and replanning effort.
Staff: Rob Kooper, Hsin-Fang Chiang, Matias Carrasco Kind, Steve Pietrowicz, Jason Alt, Margaret Johnson. Mikolaj Kowalik
Attachments
Issue Links
- relates to
-
DM-7641 Prototype functionalities of scaled batch production service components
- Done
Key | Summary | Story Points | Assignee | Status | |
---|---|---|---|---|---|
|
4 | Rob Kooper [X] (Inactive) | Done | ||
|
4 | Rob Kooper [X] (Inactive) | Done | ||
|
Make a Swim Lane Diagram for workflow in Batch Production Services |
10 | Mikolaj Kowalik | Done | |
|
Draft first three phases of Batch Production Services deployment |
13 | Joel Plutchak (Inactive) | Done | |
|
3 | Donald Petravick | Done | ||
|
Iteration 4: final draft and convert to reStructuredText to produce tech note |
4 | Unassigned | Won't Fix | |
|
7 | Unassigned | Won't Fix | ||
|
0 | Unassigned | Won't Fix | ||
|
1 | Rob Kooper [X] (Inactive) | Won't Fix | ||
|
2 | Unassigned | Won't Fix | ||
|
3 | Rob Kooper [X] (Inactive) | Won't Fix |