Capture material on 3-month planning cadence in DMTN-020

    Details

    • Type: Story
    • Status: Done
    • Resolution: Done
    • Fix Version/s: None
    • Component/s: None
    • Labels:
      None
    • Templates:
    • Story Points:
      0.2
    • Epic Link:
    • Sprint:
      DRP F16-1
    • Team:
      Data Release Production

      Description

      Per discussion in DM-6532, this material is appropriate for DMTN-020:

      +It is acceptable to load the plan in 3-month chunks, e.g., the plan for
      +the first 3 months of the cycle is loaded before the start of the cycle, and the remaining
      +part of the plan covering the last 3 months is loaded before the 4th month starts. This
      +allows for minor fine-tuning of the second half of the cycle without going through the CCB
      +approval.

        Attachments

          Issue Links

            Activity

              People

              • Assignee:
                swinbank John Swinbank
                Reporter:
                swinbank John Swinbank
                Reviewers:
                Jacek Becla
                Watchers:
                Jacek Becla, John Swinbank
              • Votes:
                0 Vote for this issue
                Watchers:
                2 Start watching this issue

                Dates

                • Created:
                  Updated:
                  Resolved:

                  Summary Panel