Capture material on epic-based long term planning in DMTN-020

    Details

    • Type: Story
    • Status: Done
    • Resolution: Done
    • Fix Version/s: None
    • Component/s: None
    • Labels:
      None
    • Templates:
    • Story Points:
      0.2
    • Epic Link:
    • Sprint:
      DRP F16-1
    • Team:
      Data Release Production

      Description

      Per review of DM-6532, this material should live in DMTN-020:

      +As explained above, epics are used for planning and executing work within a cycle.
      +
      +In addition to that, epics are also extremely valuable for longer-term planning at a fine-grain level.
      +When details of work for a given planning package are known, they can and should be captured through
      +epics. Such epics can be freely created and changed at any time without any approvals. They
      +should, of course, fit within the scope and budget of related PP. They can be useful for
      +bottom-up analysis and validation of resources needed to implement a given PP. This allows
      +to do detailed planning in flexible and agile way, while ensuring the scope/cost/schedule is
      +well controlled and managed.

        Attachments

          Issue Links

            Activity

              People

              • Assignee:
                swinbank John Swinbank
                Reporter:
                swinbank John Swinbank
                Reviewers:
                Jacek Becla
                Watchers:
                Jacek Becla, John Swinbank
              • Votes:
                0 Vote for this issue
                Watchers:
                2 Start watching this issue

                Dates

                • Created:
                  Updated:
                  Resolved:

                  Summary Panel