Details

    • Type: Story
    • Status: Done
    • Priority: Major
    • Resolution: Done
    • Fix Version/s: None
    • Component/s: None
    • Labels:
      None
    • Templates:
    • Story Points:
      1
    • Epic Link:
    • Sprint:
      DRP F16-3
    • Team:
      Data Release Production

      Description

      In DM-4887 we introduced a new measurement post-processing system which we called "afterburners".

      The term "afterburner" is overloaded and applied in multiple contexts. To save confusion, please rename this system to something less ambiguous. Best if we can do this soon, before this usage spreads.

        Attachments

          Container Issues

            Issue Links

              Activity

                People

                • Assignee:
                  nlust Nate Lust
                  Reporter:
                  swinbank John Swinbank
                  Reviewers:
                  Fred Moolekamp
                  Watchers:
                  Fred Moolekamp, John Swinbank, Nate Lust
                • Votes:
                  0 Vote for this issue
                  Watchers:
                  3 Start watching this issue

                  Dates

                  • Created:
                    Updated:
                    Resolved:

                    Summary Panel