Details
-
Type:
Epic
-
Status: Invalid
-
Resolution: Done
-
Fix Version/s: None
-
Component/s: Design Documents, Requirements Documents, Review Documents
-
Labels:None
-
Epic Name:sqre-f16-dm-2
-
Story Points:35
-
WBS:1.02C.10.02
-
Team:SQuaRE
Description
This is an epic to track the work required on for DM baselined documentation from SQuaRE staff, including any associated with Working Group / replan etc
Attachments
Issue Links
Key | Summary | Story Points | Assignee | Status | |
---|---|---|---|---|---|
|
1 | David Nidever [X] (Inactive) | Won't Fix |
Activity
Epic Name | sqre-f16-dm-1 | sqre-f16-dm-2 |
Epic Child |
|
Description |
This is an epic to track the work required on for DM baselined documentation from SQuaRE staff, including any associated with Working Group / replan etc
[FE: 45% MWV: 45% DN: 10%] |
This is an epic to track the work required on for DM baselined documentation from SQuaRE staff, including any associated with Working Group / replan etc
|
Assignee | Michael Wood-Vasey [ wmwood-vasey ] | Frossie Economou [ frossie ] |
Cycle | Fall 2016 [ 10803 ] |
Remote Link | This issue links to "Page (Confluence)" [ 23276 ] |
Resolution | Done [ 10000 ] | |
Status | To Do [ 10001 ] | Invalid [ 11005 ] |
Replan is long finished and this epic contains no useful work. Closing.