Uploaded image for project: 'Data Management'
  1. Data Management
  2. DM-7925

Build a prototype AP pipeline

    Details

    • Type: Epic
    • Status: Done
    • Resolution: Done
    • Fix Version/s: None
    • Component/s: ap
    • Templates:
    • Epic Name:
      Prototype AP Pipeline
    • Story Points:
      60
    • WBS:
      02C.03.00
    • Team:
      Alert Production
    • Cycle:
      Fall 2016

      Description

      The goal is to build a prototype AP end to end pipeline. It should include an interesting amount of the total AP system: ISR (hopefully), image characterization, calibration, image difference, and difference source measurement.

      The final product will be a document describing the pipeline and a system to run some amount of data through the pipeline in a reasonably automated way. It does not need to be a fully automated or scalable system, but should be able to run enough data through without manual intervention that we can get an idea about performance and scaling for future work.

        Attachments

          Issue Links

            Activity

              People

              • Assignee:
                mrawls Meredith Rawls
                Reporter:
                krughoff Simon Krughoff
                Watchers:
                Meredith Rawls, Simon Krughoff
              • Votes:
                0 Vote for this issue
                Watchers:
                2 Start watching this issue

                Dates

                • Created:
                  Updated:
                  Resolved:

                  Summary Panel