"Site Specific Infrastructure Estimation" (LDM-144) Updates for Ops Planning

    Details

    • Type: RFC
    • Status: Withdrawn
    • Resolution: Done
    • Component/s: DM, TCT
    • Labels:
      None

      Description

      v147. Updated per operations planning:

      • operations 2023-2032
      • post op years 2033-3034
      • extended predictions through 2034
      • post op years see no hardware purchase, no decommissioning. 3% failure rate

      based on v146.

      http://ls.st/ldm-144*

        Attachments

          Issue Links

            Activity

            Hide
            tjenness Tim Jenness added a comment -

            Just to clarify, v147 is Docushare version 23 and this supersedes v146 (Docushare version 22) that was submitted as part of RFC-210. Should we therefore be approving RFC-210 and this RFC at the same time? Or are you wanting RFC-210 to be accepted and then have this newer version accepted afterwards?

            The current preferred version is Docushare 21 from January 2016 (v145).

            Since this is a discussion of an LDM I am adding component TCT to this RFC.

            Show
            tjenness Tim Jenness added a comment - Just to clarify, v147 is Docushare version 23 and this supersedes v146 (Docushare version 22) that was submitted as part of RFC-210 . Should we therefore be approving RFC-210 and this RFC at the same time? Or are you wanting RFC-210 to be accepted and then have this newer version accepted afterwards? The current preferred version is Docushare 21 from January 2016 (v145). Since this is a discussion of an LDM I am adding component TCT to this RFC.
            Hide
            tjenness Tim Jenness added a comment -

            What do these changes mean for the cost of construction (as opposed to the operations part which I imagine is open to more debate based on the operations reviews)?

            Show
            tjenness Tim Jenness added a comment - What do these changes mean for the cost of construction (as opposed to the operations part which I imagine is open to more debate based on the operations reviews)?
            Hide
            jalt Jason Alt [X] (Inactive) added a comment -

            v146 was a semi annual update with costs and minor edits. v147 is a feature change that adds the change in operations.

            Since I am about to make yet another semi annual update, I suggest that we cancel both of these RFCs and deal with the process in the updated version (Feb 1) which will include all changes.

            Show
            jalt Jason Alt [X] (Inactive) added a comment - v146 was a semi annual update with costs and minor edits. v147 is a feature change that adds the change in operations. Since I am about to make yet another semi annual update, I suggest that we cancel both of these RFCs and deal with the process in the updated version (Feb 1) which will include all changes.
            Hide
            tjenness Tim Jenness added a comment -

            Withdrawn at the request of Jason Alt [X] pending a new version being submitted to the TCT in February.

            Show
            tjenness Tim Jenness added a comment - Withdrawn at the request of Jason Alt [X] pending a new version being submitted to the TCT in February.

              People

              • Assignee:
                jalt Jason Alt [X] (Inactive)
                Reporter:
                jalt Jason Alt [X] (Inactive)
                Watchers:
                Donald Petravick, Fabio Hernandez, Jacek Becla, Jason Alt [X] (Inactive), Kian-Tat Lim, Mario Juric, Robert Lupton, Tim Jenness, Zeljko Ivezic
              • Votes:
                0 Vote for this issue
                Watchers:
                9 Start watching this issue

                Dates

                • Created:
                  Updated:
                  Resolved:
                  Planned End:

                  Summary Panel